Table of Contents Table of Contents
Previous Page  91 / 210 Next Page
Basic version Information
Show Menu
Previous Page 91 / 210 Next Page
Page Background

BEAM P

LUS

I

NTERIORS

C

OMMERCIAL

, R

ETAIL

A

ND

I

NSTITUTIONAL

E

NERGY

U

SE

(EU)

EU 5 M

ETERING AND

M

ONITORING

Copyright © BEAM Society Limited. All rights reserved. Page 90

EU 5 M

ETERING AND

M

ONITORING

E

XCLUSION

None.

O

BJECTIVE

real time monitoring, measurement, and historical record keeping, to

enable managing and improving energy performance.

C

REDIT ATTAINABLE

4

C

REDIT REQUIREMENT

a) Electrical meters

3 credits for monitoring system and appliance electricity consumption,

the Applicant shall install electricity sub-metering to record electricity

consumption of the following equipment serving the project space

irrespective of ownership (at the minimum):

i.

HVAC&R systems (including supplementary air conditioning,

if any);

ii.

Lighting Systems;

iii.

Small power (plug loads);

iv.

Lifts and escalators (if any);

v.

Domestic hot water systems (if any);

vi.

Pools, Spa, and whirlpools (if any);

vii.

Loads associated with server/equipment room (if any);

viii.

High electrical power equipment (>25kVA, if any).

b) Thermal energy meters for chilled water

1 credit for installation of thermal energy meters for monitoring chilled

water consumption.

A

SSESSMENT

a) Electrical meters

Criteria

The assessment focuses on the largest categories of energy

consumption, which for interiors would be HVAC&R systems

(including supplementary air conditioning, if any); lighting systems;

small power (plug loads); domestic hot water systems (if any); loads

associated with server room (if any) and high electrical power

equipment (>25kVA, if any) installed by the Applicant and serving the

project space.

Meters shall record every minute, hourly, daily, weekly, and monthly

and data shall be saved with either:

i.

‘Smart’ meters or meter with data-recording ability; or

ii.

building automation/energy management system.

Electricity metering (for input power, energy and maximum demand),

together with associated measuring transducers/transformers for

indicating power and energy, shall comply with an appropriate

standard such as BS EN [

1]

and to at least accuracy class 1.

Documentation

Credits shall be achieved when the Applicant provides the

documentation stated below, to demonstrate compliance:

i.

List responsible person;

1

British Standard BS EN 62053-11:2003, Electricity metering equipment (AC),Particular requirements.

Electromechanical meters for active energy (classes 0,5, 1 and 2)