OMMISSIONING

Copyright © BEAM Society Limited. All rights reserved. Page 85

EU 3 C

OMMISSIONING

E

XCLUSION

None.

O

BJECTIVE

Commissioning the Building Services installation is the first and vital

step for energy efficient operation, and validate that the systems

operate as intended.

C

REDIT ATTAINABLE

4

C

REDIT REQUIREMENT

a) Commissioning plans

2 credits for provision of:

i.

Commissioning plan detailing all specified commissioning

work for HVAC&R, lighting and other Building Services

systems that impact on energy use and indoor environmental

quality;

ii.

The commissioning plan shall be endorsed by an

Independent Commissioning Authority (iCXA).

b) Commissioning reports

2 credits for provision of:

i.

commissioning reports for HVAC&R, lighting and other

Building Services systems that impact on energy use and

indoor environmental quality;

ii.

commissioning reports shall be endorsed by an iCXA.

A

SSESSMENT

Where no alterations to building services* in the host building are

undertaken and no supplementary building services are installed, 4

credits in EU 3a) and 3b) are achieved when the Applicant provides

the documentation stated below, to demonstrate compliance:

i.

Contractual document from the space owner that confirms

that no alternations to the building services provided by the

host building were undertaken and no supplementary building

services were installed.

For project where alterations to host building services* are undertaken

or supplementary building services are installed, the following criteria

apply.

a) Commissioning plan

Criteria

The commissioning plan shall fulfil the requirements detailed in

Appendix 9.2.1 a

s a minimum and it shall be endorsed by the iCXA.

The iCXA shall meet all of the following requirements based on the

project area:

i.

For project area less than 1,000m

2

, the iCXA shall be an

independent person who is not involved in the design and

general installation works and with commissioning experience

in at least two (2) fit-out projects.

ii.

For project area larger than 1,000m

2

, the iCXA shall be an

independent person who is not involved in the design and

general installation works and meet the following

requirements:

a.)

Registered Professional Engineer (R.P.E.)

registered with the Engineers Registration Board

(ERB) in Building Services, Electrical,