EU 3 C

OMMISSIONING

Copyright © BEAM Society Limited. All rights reserved. Page 87

Documentation

Credit(s) shall be achieved when the Applicant provides the

documentation stated below, to demonstrate criteria compliance:

i.

iCXA Resume;

ii.

commissioning plan , records, reports all endorsed by iCXA

iii.

record photographs;

iv.

engagement letter for iCxA stating ICXA is responsible for

reporting of all conditions, and findings directly to the owner;

Note: Minor adjustment/relocation (within 1 metre) of existing host

building air conditioning and lighting systems shall be considered as

“no alteration to host building system” under this Assessment.

B

ACKGROUND

Commissioning is a quality assurance process for systems from

concept to completion, and operation.

It involves verifying, and documenting the performance of each

system to meet the operational need within the capabilities of the

documented design and equipment capacities, according to the

owner’s functional criteria.

In this context, commissioning shall also include preparing project

operational and maintenance documentation, and training for

operation and maintenance personnel. The result should be fully

functional systems that can be properly operated and maintained

throughout the life of th

e project space .

CIBSE [

1, 2

,

3]

, BSRIA [

4]

and ASHRAE [

5]

publications provide

guidance on commissioning requirements and procedures, such as

management, design for commissioning, access, testing,

measurements and tolerances, installed transducers, specification for

portable measuring equipment, etc. Architectural Services

Department publishes commissioning procedures for Government

buildings [

6]

.

Effective commissioning and proper instruction for operation and

maintenance procedures have been shown to improve the operating

efficiency and environmental performance of systems over their life

cycle. The commissioning requirements shall cover all HVAC&R,

lighting and other Building Services systems including but not limited

to, the renewable systems (if any), energy monitoring systems (if any)

and domestic hot water systems (if any).

The iCXA must oversee the implementation of the Commissioning

Plan, this work should compliment and not cross over the

responsibility of the building services designers who may also have

commissioning responsibility.

1

The Chartered Institution of Building Services Engineers. Air distribution systems. CIBSE Commissioning Code A

2

The Chartered Institution of Building Services Engineers. Water distribution systems. CIBSE Commissioning Code W

3

The Chartered Institution of Building Services Engineers. Automatic controls. CIBSE Commissioning Code C

4

Building Services Research and Information Association. Commissioning air systems. Application procedures for

buildings.

http://www.bsria.co.uk/

5

ASHRAE. New Building Commissioning.

http://www.ashrae.org/

6

Architectural Services Department, Building Services Branch. Testing and Commissioning Procedure No.1 for Air-

conditioning, Refrigeration, Ventilation and Control System in Government Buildings.

http://www.archsd.gov.hk/en/publications.aspx