EU 3 C

OMMISSIONING

Copyright © BEAM Society Limited. All rights reserved. Page 86

Mechanical or Environmental discipline and/or

Member of the Hong Kong Institution of

Engineers (MHKIE) in Building Services,

Electrical, Mechanical or Environmental

discipline;

b.)

Relevant commissioning experience in at least 2

buildings or fit out projects;

c.)

Must not be an employee of, or contracted

through, a contractor or construction manager

dealing with construction contracts.

The commissioning plans shall cover the following energy and IEQ

related systems:

i.

Heating, ventilating, air conditioning and refrigeration

(HVAC&R) systems and associated controls;

ii.

Lighting systems and associated controls;

iii.

Energy monitoring systems (if any);

iv.

Renewable energy systems (if any);

v.

Domestic hot water systems (if any)

vi.

Other systems where installed by the Applicant in th

e project space

(for example dumb waiter, lift, escalator, etc.)

In brief, the criteria can be summarised in the matrix as shown:

Alter the base BS*

or install

supplementary BS?

Area

(m

2

)

Requirements in brief

No

All size Credits are deemed to be

achieved.

Yes

All size iCXA

b) Commissioning Report

Criteria

The records of functional testing of systems and equipment shall be

performed as documented in the commissioning plan and endorsed

by iCXA.

The commissioning report shall cover as a minimum the items given

in

Appendix 9.2.2 ,

after all commissioning tasks, except seasonally

deferred testing, have been completed.

Commissioning reports shall be verified and signed-off by the iCXA.

The commissioning records and reports shall cover the following

systems, where installed:

i.

Heating, ventilating, air conditioning and refrigeration

(HVAC&R) systems and associated controls;

ii.

Lighting systems and associated controls;

iii.

Energy monitoring systems;

iv.

Renewable energy systems;

v.

Domestic hot water systems;

vi.

Plumbing and Drainage systems:

vii.

Lifts and Escalators;

Only systems installed by the Applicant serving th

e project space

shall be assessed.