BEAM P
LUS
I
NTERIORS
C
OMMERCIAL
, R
ETAIL
A
ND
I
NSTITUTIONAL
E
NERGY
U
SE
(EU)
EU 3 C
OMMISSIONING
Copyright © BEAM Society Limited. All rights reserved. Page 86
Mechanical or Environmental discipline and/or
Member of the Hong Kong Institution of
Engineers (MHKIE) in Building Services,
Electrical, Mechanical or Environmental
discipline;
b.)
Relevant commissioning experience in at least 2
buildings or fit out projects;
c.)
Must not be an employee of, or contracted
through, a contractor or construction manager
dealing with construction contracts.
The commissioning plans shall cover the following energy and IEQ
related systems:
i.
Heating, ventilating, air conditioning and refrigeration
(HVAC&R) systems and associated controls;
ii.
Lighting systems and associated controls;
iii.
Energy monitoring systems (if any);
iv.
Renewable energy systems (if any);
v.
Domestic hot water systems (if any)
vi.
Other systems where installed by the Applicant in th
e project space(for example dumb waiter, lift, escalator, etc.)
In brief, the criteria can be summarised in the matrix as shown:
Alter the base BS*
or install
supplementary BS?
Area
(m
2
)
Requirements in brief
No
All size Credits are deemed to be
achieved.
Yes
All size iCXA
b) Commissioning Report
Criteria
The records of functional testing of systems and equipment shall be
performed as documented in the commissioning plan and endorsed
by iCXA.
The commissioning report shall cover as a minimum the items given
in
Appendix 9.2.2 ,after all commissioning tasks, except seasonally
deferred testing, have been completed.
Commissioning reports shall be verified and signed-off by the iCXA.
The commissioning records and reports shall cover the following
systems, where installed:
i.
Heating, ventilating, air conditioning and refrigeration
(HVAC&R) systems and associated controls;
ii.
Lighting systems and associated controls;
iii.
Energy monitoring systems;
iv.
Renewable energy systems;
v.
Domestic hot water systems;
vi.
Plumbing and Drainage systems:
vii.
Lifts and Escalators;
Only systems installed by the Applicant serving th