BEAM P

LUS

I

NTERIORS

C

OMMERCIAL

, R

ETAIL

A

ND

I

NSTITUTIONAL

S

UMMARY OF

C

REDITS

Copyright © BEAM Society Limited. All rights reserved. Page 32

Section

Credit Requirement

Credit

7

I

NDOOR

E

NVIRONMENTAL

Q

UALITY

(IEQ)

24

IEQ 1

I

NDOOR

A

IR

Q

UALITY

A.

Specifications

For each of the materials categories (A1 to A5), one credit is

achieved when compliance is demonstrated through submission of

the requisite documentation.

Alternative:

B.

Measurement

For each of the categories of contaminants (B1 to B5) one credit is

achieved if measured concentrations obtained through appropriate

measurements comply with the Good Class requirements in the IAQ

Certification Scheme.

5

IEQ 2

I

NDOOR

P

LANTING

1 credit for fulfilling at least two (2) items as shown below.

2 credits for fulfilling at least four (4) items as shown below.

i.

The minimum density is one large plant (300mm pot) or two

small plants (200mm pot) per two workstations;

ii.

Green wall of at least 5m

2

is provided;

iii.

The plant species are carefully selected and suitable to be

planted in indoor environment;

iv.

A “Horticultural Maintenance Plan” shall be in place to

ensure the health of the plants are maintained;

v.

No electricity is required to maintain and for the growth of the

plants.

2

IEQ 3

M

INIMUM

V

ENTILATION

P

ERFORMANCE

1 credit for demonstrating that the project is in compliance with the

minimum requirements of ANSI/ASHRAE 62.1-2010 in respect of

Outdoor Air Quality and Minimum Ventilation Rate.

Alternative:

1 credit for demonstrating that carbon dioxide level within the project

space can comply with Good Class requirement as stipulated in IAQ

Certification Scheme.

1

IEQ 4

P

RE

-

OCCUPANCY

F

LUSH

O

UT

1 credit for flushing out of normally occupied project spaces prior to

occupancy.

1

IEQ 5

T

ENANT

E

XHAUST

1 credit for providing independent exhaust system for all photocopy /

printing rooms and other locations where significant indoor pollution

sources are generated.

1

IEQ 6

U

NCONTROLLED

V

ENTILATION

1 credit for undertaking tests in the premises using a non-balanced

test method to demonstrate that the air tightness is within recognised

limits.

1

IEQ 7

T

HERMAL

C

OMFORT

a) Temperature

1 credit for demonstrating the air temperature within the project space

is ±1.5 DegC of the set point temperature when the air side system is

operating at steady state under normal occupied periods.

b) Relative humidity

1 credit for demonstrating the relatively humidity within the project

space is less than 70%.

c) Air movement

1 credit for demonstrating the air movement within the project space

is less than 0.3m/s.

3

IEQ 8

I

NTERIOR

L

IGHTING

Q

UALITY

3 credits where the uniformity, glare index and colour rendering index

(1 credit for each parameter) at all workstations can comply with

CIBSE requirements.

3

IEQ 9

N

ATURAL

L

IGHTING

1 credit where 75% of workstations or seating are located in an area

of floor with natural light illuminance level of 100 lux.

2 credits where 85% of workstations or seating is located in an area

of floor with natural light illuminance level of 100 lux.

2