Table of Contents Table of Contents
Previous Page  116 / 210 Next Page
Basic version Information
Show Menu
Previous Page 116 / 210 Next Page
Page Background

BEAM P

LUS

I

NTERIORS

C

OMMERCIAL

, R

ETAIL

A

ND

I

NSTITUTIONAL

I

NDOOR

E

NVIRONMENTAL

Q

UALITY

(IEQ)

IEQ 9 N

ATURAL

L

IGHTING

Copyright © BEAM Society Limited. All rights reserved. Page 115

IEQ 9 N

ATURAL

L

IGHTING

E

XCLUSION

None.

O

BJECTIVE

Encourage a holistic examination of interior layout, building design,

and fenestration design, such as to maximise access to daylight for

the purposes of improved health and comfort.

C

REDIT ATTAINABLE

2

C

REDIT REQUIREMENT

1 credit where 75% of workstations or seating are located in an area

of floor plate that has a natural light illuminance level of 100 lux.

2 credits where 85% of workstations or seating is located in an area of

floor plate that has a natural light illuminance level of 100 lux.

A

SSESSMENT

Criteria

The credit(s) can be achieved by either measurement or computer

modelling.

The Applicant can simply use a lux meter to measure the illuminance

levels at all workstations when all artificial lighting is switched off at

noon time and under sunny day condition.

Alternative

The Applicant can use computer software such as Radiance to

simulate the illuminance level under overcast sky condition. The

report submitted shall identify the key parameters used in the

computations/modelling, especially with regard to glazing

transmittance, and the reflectance’s of external and internal surfaces.

The values of the parameters shall reflect the nature and type of

surfaces on the external vertical obstructions and horizontal surfaces,

and likely internal finishes. In addition, to ensure a realistic result that

reflects the urban density of Hong Kong, surrounding buildings shall

be included in the model.

Documentation

Credit(s) shall be achieved when the Applicant provides the

documentation stated below, to demonstrate criteria compliance:

i.

summary table showing the measurement, date, time, sky

conditions, percentage of compliance.

ii.

drawings, interior layout plan;

iii.

site measurement with calibrated device;

iv.

record photographs;

Alternative:

i.

Computer modelling report;

ii.

Information showing the transmittance of the glazing;

iii.

Schedule of internal finishes used in the modelling;

iv.

Summary table showing the percentage of compliance.