9.2.1 Commissioning Plan

9.2.2 Commissioning Reports

9.2.3 Operations and Maintenance Manual

9.2.4 Energy Management Manual

9.2.1 C

OMMISSIONING

P

LAN

To execute commissioning in a comprehensive and orderly manner a

commissioning plan, covering every system, equipment, and

component shall be prepared. The plan shall include:

i.

start-up and inspection checklists and procedures;

ii.

functional performance testing procedures and checklists;

iii.

testing, adjusting, and balancing;

iv.

development of an operations and maintenance manual and

energy management manual;

v.

completion of the commissioning report;

For each system commissioned the plan shall provide:

i.

an overview of the tasks to be executed during

commissioning;

ii.

a list of all features to be commissioned;

iii.

a list of reference documents related to commissioning,

including specification references, drawing list, and submittal

drawings;

iv.

a list of primary participants in the commissioning process and

their responsibilities;

v.

a plan for management, communication and documentation;

vi.

description of checklists and tests to be performed, with

reference to specification;

vii.

pre-start and start-up checklists;

viii.

list of the functional performance tests to be performed;

ix.

description of the training to be provided to the operations and

maintenance personnel

9.2.2 C

OMMISSIONING

R

EPORT

The commissioning report shall document the commissioning process,

and results, it shall comprise:

i.

executive summary;

ii.

list of participants and their respective roles;

iii.

brief project space description;

iv.

an overview of the scope of testing and commissioning;

v.

general description of testing and verification methods;

vi.

list of each feature component, and system commissioned;

vii.

for each piece of commissioned equipment, the determination

of the iCxA regarding the adequacy of the equipment,

documentation and training.

The commissioning report shall address the following areas:

i.

adequacy of equipment with respect to construction

documents and design intent;

ii.

equipment installation;