iii.
functional performance and efficiency;
iv.
equipment documentation;
v.
operations and maintenance review and recommendations;
vi.
operator training;
The functional performance and efficiency section for each piece of
equipment shall identify the verification method used observations and
conclusions from the commissioning process. The report shall include
a list of outstanding commissioning issues, and any deferred or
seasonal testing that should be scheduled.
All outstanding deficiencies identified during or as a result of
commissioning activities shall have been corrected or must be
separately listed and highlighted in the commissioning report.
Each non-compliance issue must be referenced to where the
deficiency is documented.
Verification and documentation of installation of systems, equipment
and components shall ensure:
i.
that they are installed according to construction documents
and manufacturers instructions;
ii.
any differences between the final installation and the original
construction documents shall be documented;
iii.
that other building systems or components are not
compromising the efficiency of the systems or features being
commissioned;
iv.
the start-up and inspection checklists were completed and
performed as required;
v.
that functional performance tests were completed;
vi.
that HVAC&R piping testing and duct testing was completed
and documentation is included in operation and maintenance
manual;
vii.
functional testing of all control systems was completed;
viii.
record of any deficiencies and corrective actions;
ix.
final testing outcomes are included in the commissioning
report and in the operation and maintenance manual;
x.
documentation of any seasonally deferred testing and
corrections of any deficiencies;
xi.
the operations and maintenance manual and energy
management manual are complete for all components,
equipment, subsystems, and systems that have been
commissioned;
xii.
adequacy of training provided for the Owner’s management,
operation and maintenance personnel
If components, equipment, subsystems, or controls, or sequences of
operations as-built are differing from the original construction
documents, the report shall detail these differences.
When any deferred or seasonally deferred commissioning is
completed the iCxA shall issue an addendum, arranged in the same
manner as in the initial commissioning report.