9.2 P

ROVISIONS FOR

E

NERGY

M

ANAGEMENT

Copyright © BEAM Society Limited. All rights reserved. Page 135

iii.

functional performance and efficiency;

iv.

equipment documentation;

v.

operations and maintenance review and recommendations;

vi.

operator training;

The functional performance and efficiency section for each piece of

equipment shall identify the verification method used observations and

conclusions from the commissioning process. The report shall include

a list of outstanding commissioning issues, and any deferred or

seasonal testing that should be scheduled.

All outstanding deficiencies identified during or as a result of

commissioning activities shall have been corrected or must be

separately listed and highlighted in the commissioning report.

Each non-compliance issue must be referenced to where the

deficiency is documented.

Verification and documentation of installation of systems, equipment

and components shall ensure:

i.

that they are installed according to construction documents

and manufacturers instructions;

ii.

any differences between the final installation and the original

construction documents shall be documented;

iii.

that other building systems or components are not

compromising the efficiency of the systems or features being

commissioned;

iv.

the start-up and inspection checklists were completed and

performed as required;

v.

that functional performance tests were completed;

vi.

that HVAC&R piping testing and duct testing was completed

and documentation is included in operation and maintenance

manual;

vii.

functional testing of all control systems was completed;

viii.

record of any deficiencies and corrective actions;

ix.

final testing outcomes are included in the commissioning

report and in the operation and maintenance manual;

x.

documentation of any seasonally deferred testing and

corrections of any deficiencies;

xi.

the operations and maintenance manual and energy

management manual are complete for all components,

equipment, subsystems, and systems that have been

commissioned;

xii.

adequacy of training provided for the Owner’s management,

operation and maintenance personnel

If components, equipment, subsystems, or controls, or sequences of

operations as-built are differing from the original construction

documents, the report shall detail these differences.

When any deferred or seasonally deferred commissioning is

completed the iCxA shall issue an addendum, arranged in the same

manner as in the initial commissioning report.