Table of Contents Table of Contents
Previous Page  138 / 210 Next Page
Basic version Information
Show Menu
Previous Page 138 / 210 Next Page
Page Background

BEAM P

LUS

I

NTERIORS

C

OMMERCIAL

, R

ETAIL

A

ND

I

NSTITUTIONAL

A

PPENDICES

9.2 P

ROVISIONS FOR

E

NERGY

M

ANAGEMENT

Copyright © BEAM Society Limited. All rights reserved. Page 137

The manual shall include an as-built documentation package for

controls covering the following:

i.

control drawings and schematics;

ii.

normal operation;

iii.

shutdown;

iv.

unoccupied operation;

v.

seasonal changeover;

vi.

manual operation;

vii.

controls set-up and programming;

viii.

troubleshooting;

ix.

alarms;

x.

final sequences of operation.

9.2.4 E

NERGY

M

ANAGEMENT

M

ANUAL

The details shall include:

i.

guidelines for establishing and tracking benchmarks for space

energy use and primary plant equipment efficiencies;

ii.

descriptions of the final design intent and basis of design,

including brief descriptions of each system;

iii.

final sequences of operations for all equipment;

iv.

procedures for seasonal start-up and shutdown, manual and

restart operation;

v.

as-built control drawings;

vi.

for all energy-saving features and strategies, rationale

description, operating instructions, and caveats about their

function and maintenance relative to energy use;

vii.

specifications for re-calibration frequency of sensors and

actuators by type and use;

viii.

recommendations for continuous commissioning or

recommended frequency for re-commissioning by equipment

type, with reference to tests conducted during initial

commissioning;

ix.

recommendations regarding seasonal operational issues

affecting energy use;

x.

list of all user-adjustable set points and reset schedules, with

a discussion of the purpose of each and the range of

reasonable adjustments with energy implications;

xi.

schedules of inspection frequency for reviewing the various

set points and reset schedules to ensure they still are near

optimum;

xii.

list of time-of-day schedules and a frequency to review them

for relevance and efficiency;

xiii.

guidelines for ensuring that future renovations and equipment

upgrades will not result in decreased energy efficiency and

will maintain the design intent;