iii.

testing and commissioning records;

CO

2

Sensors Controlling Fresh Air Rate

Credit shall be achieved where the following was provided:

i.

All air handling units and primary air handling units installed

by the Applicant and supplying outdoor air to the project

space shall be variable speed, and controlled by CO

2

sensors

capable of sensing and modulating outdoor air rate in

response to demand;

ii.

testing and commissioning records shall also indicate the CO

2

set point for maximum and minimum outdoor air;

Enthalpy Controlled Free Cooling by Host building

Credit shall be achieved where the following was provided:

i.

All air handling units, and primary air handling units installed

have the capacity to deliver 100% outdoor air to the project

space;

ii.

Enthalpy sensors shall control the delivery of outdoor air into

the

project space

dependant on the Enthalpy set points;

iii.

testing and commissioning records shall state set points;

Recommended Installation Positions For Air Conditioning Units

Credit shall be achieved where the following was provided:

i.

all air conditioning units (including indoor and outdoor units of

for split-type, VRV, VRF air-conditioning units, and window

type air conditioning units) installed by the Applicant and

serving the project space shall comply with the recommended

installation dimensions given in manufacturers installation

specification;

ii.

drawings, dimensioned 1:50 scale installation drawings

demonstrating the installation position of the air-conditioning

units installed;

iii.

Letter from the manufacturer or supplier stating that the

installation position of air-conditioning units complies with the

recommended installation dimensions;

Provision of Openable Windows

Credit shall be achieved where the following was provided:

i.

openable windows, within the project space, have a total area

not less than 1/16 of the internal floor area.

M

INIMUM

S

YSTEM

REQUIREMENTS FOR

P

RESCRIPTIVE

L

IGHTING

S

TRATEGIES

Reduction of Lighting Power Density (LPD)

Credit shall be achieved where the following was provided:

i.

calculation, the method for Lighting Power Density (LPD) shall

reference latest version of BEC. Baseline values shall also

reference the latest version of BEC;

ii.

technical data sheets for equipment;

iii.

record photographs;

Appropriate Zoning and Manual Control Distribution

Credit shall be achieved where the following were provided: