Alternatively,

1 credit for a reduction in electricity maximum demand of 10%, as demonstrated

by billing/metering data.

2 credits for a reduction of electricity maximum demand of 20%, as

demonstrated by billing/metering data.

2

E

U

3 V

ENTILATION

S

YSTEMS IN

C

AR

P

ARKS

1 credit for ventilation systems that will consume less electricity than those

meeting the zero credit requirements (baseline) by 20% or more.

2 credits where the consumption is reduced by 25% or more.

Buildings without

carpark or carpark area

less than 10% CFA.

2

E

U

4 L

IGHTING

S

YSTEM IN

C

AR

P

ARKS

1 credit for using lamps and, where applicable, ballasts that will consume less

electricity than those meeting the zero-credit requirements by 20% or more.

2 credits where the consumption is reduced by 25% or more.

Buildings without

carpark or carpark area

less than 10% CFA.

2

E

U

5 R

ENEWABLE

E

NERGY

S

YSTEMS

1 to 5 credits where 0.5% to 2.5% or more of building energy consumption is

obtained from renewable energy sources.

None.

5

Alternatively,

1 to 5 credits where the minimum percentage of 20% to 100% of the building

footprint is being covered/used by PV panels respectively and/or other renewable

power facility generation equivalent renewable power output.

E

U

6 A

IR

-

CONDITIONING

U

NITS

1 credit for complying with the recommended installation positions for air-

conditioning units with regard to internal spaces; complying with the minimum

width of any external recess with regard to heat rejection; and complying with the

items listed in the assessment checklist.

Buildings not using

window and/or split-type

air-conditioners.

1

E

U

7 E

NERGY

E

FFICIENT

A

PPLIANCES

1 credit when 60% of total rated power of appliances and equipment are certified

energy efficient products.

2 credits when 80% of total rated power of appliances and equipment are

certified energy efficient products.

Buildings where

appliances are not

provided by the

developer.

2

E

U

8 T

ESTING AND

C

OMMISSIONING

1 credit for ongoing programme of commissioning of water side equipment of

central air-conditioning system.

1 credit for ongoing programme of commissioning of air side equipment of

central air-conditioning system.

All 3 credits applicable

to buildings with central

HVAC services.

For residential and

similar buildings only

the last 2 credits apply.

2

Alternatively,

1 credit for ongoing programme of commissioning of all HVAC equipment.

1