The zero-credit benchmark for the Assessed Building (the existing
building) will equal 150% of the predicted annual energy use of the
Baseline Building. The 50% margin is meant for making allowances for
operating conditions that will inevitably arise which will cause more
energy to be used, e.g. over-time air-conditioning provision for offices in
an office/commercial building and deterioration in performance of the air-
conditioning equipment, etc.
The annual energy use of the assessed building will be determined
based on the records of energy use in the building, as given in available
energy billing and audit data. For a single-user building (e.g. a
government complex), the records will reflect the total energy use in the
entire building. However, for a multi-tenanted building (e.g. a typical
office/commercial building), individual tenants have their consumption
separately metered and it is impossible to ask all tenants to provide their
consumption records for the assessment. The assessment for multi-
tenanted buildings, therefore, will be limited to the consumption of the
landlord. However, where there is air-handling equipment inside tenants’
premises, which are supplied with electricity from the tenants’ meters,
the annual energy use of such air-handling equipment will be estimated
and added to the landlord’s consumption. The zero-credit energy use
benchmark will also take this into account.
Besides the annual energy use, the assessment of the energy
performance of a building includes, where applicable, an assessment of
its peak electricity demand. This will be undertaken in a way similar to
the energy use assessment. The zero-credit benchmark for peak
electricity demand will be 125% of that of the Baseline Building model.
Credits for this assessment will be determined with reference to the
factor of reduction in the peak electricity demand of the Assessed
Building relative to that of the Baseline Building model. Note that this part
of the assessment will apply only to those buildings where electricity
charges are based either on the Bulk Tariff, Large Power Tariff or
Maximum Demand Tariff. Buildings not using one of these tariff will not
be assessed for peak electricity demand under this approach, due to lack
of reliable data.
The characteristics to be incorporated into the Baseline Building model,
including the indoor design conditions, ventilation rates, occupation
density and patterns, internal load intensities and patterns, and
performance of air-conditioning equipment are to be as described in
Section 8.2.
The energy use and peak electricity demand of installations and
equipment other than the air-conditioning installations will be predicted
based on the installed power, the operating hours and the pattern of use
for each type of installations. The assessment will be based on the sum
of the energy use, and the peak electricity demand, of the air-
conditioning and other installations. Here, the assumption is made that
the air-conditioning energy use is the dominant time-varying load whilst
the energy use of other installations is relatively stable and may be
regarded as a steady load.
8.1.3 P
REREQUISITES
A prerequisite for obtaining credits for Annual Energy Use under the
Energy Budget approach is compliance with specific items in the HKSAR
Government’s energy efficiency codes, as follows: