8.5 P
ROVISION FOR
E
NERGY
M
ANAGEMENT
Copyright © 2012 BEAM Society Limited. All rights reserved.
A - 18
and design intent;
equipment installation;
functional performance and efficiency;
equipment documentation;
operations and maintenance review and recommendations; and
operator training.
The functional performance and efficiency section for each piece of
equipment shall identify the verification method used observations and
conclusions from the testing.
The report must also include a list of outstanding commissioning issues
and any testing that is scheduled for a later date.
All outstanding deficiencies identified during or as a result of
commissioning activities shall have been corrected or must be separately
listed and highlighted in the commissioning report.
Each non-compliance issue must be referenced to where the deficiency
is documented.
Verification and documentation of installation of systems, equipment and
components shall ensure:
that they are installed according to construction documents and
manufacturer’s instructions;
or any differences between the final installation and the original
construction documents are documented;
that other building systems or components are not compromising
the efficiency of the systems or features being commissioned;
the start-up and inspection checklists were completed and
performed as required;
that functional performance tests are completed as required.
that HVAC piping testing and duct testing is completed and
documentation is included in operations and maintenance
manuals;
sufficient functional testing of any control systems;
that testing record include any deficiencies and corrections;
final testing outcomes are included in the commissioning report
and in operations and maintenance manuals;
documentation of any seasonally deferred testing and corrections
of any deficiencies;
the operations and maintenance manual and energy management
manual are complete for all components, equipment, subsystems,
and systems that have been commissioned; and
adequacy of training provided for the Owner's management,
operations and maintenance personnel.
If components, equipment, subsystems, or controls, or sequences of
operations as-built are differing from the original construction documents,
the report shall detail these differences.
If seasonally deferred testing is completed to be under the original
contract, the commissioning authority shall issue an addendum to the
report, arranged in the same manner as in the initial report.