1.2

8.6 A

SSUMPTIONS AND

B

ASELINES FOR

W

ATER

C

ONSUMPTION

Copyright © 2012 BEAM Society Limited. All rights reserved.

A - 23

flushed after every use. Each male employees use the urinal on average

four (4) times per day.

The water use in the project building would be based on the same

number of male employees each using the urinals four (4) times per day.

The calculation shall consider the actual flushing strategy employed.

An estimate of the potential water savings is not able to be determined

as it would be influenced by the number of male employees and the time

interval of flushing.

H

AND

W

ASHING IN

R

EST

R

OOMS

Number of hand wash operations per occupant per day = 5

Hand washing time = 10 seconds

For the baseline building, the tap flow rate is 8.3 litres/min [4]

Note that to obtain significant savings the project space would need to

install automatic controls such as proximity sensors to reduce the tap

operation time to less than the default assumption of 10 seconds per

hand washing operation.

W

ATER

U

SE IN

P

ANTRIES

/

KITCHEN

For non-residential,

Number of pantry tap operations per occupant per day = 1

Baseline faucet flow rate = 8.3 litres/min

[4]

Duration of use = 15 seconds

Utensil washing operation carried out by hand = 6 litres of water per

operation

For residential,

Number of use per resident per day = 4

Baseline faucet flow rate = 8.3 litres/min [4]

Duration of use = 60 seconds

S

HOWERS

Number of use of shower per occupant per day = 0.1 (for non-

residential)

Number of use of shower per resident per day = 1 (for residential)

The baseline shower flow rate = 9.5 litres/min

[4]

Shower duration = 5 minutes (300 seconds)

O

THER

A

PPLIANCES

/

E

QUIPMENT

Justification for capacities of appliance/equipment used in the

benchmark building shall be provided by making reference to

regulations, standards, guides and other publication published by various

authorities.

4

USGBC, LEED 2009 for New Construction and Major Renovations Project