control drawings and schematics;
normal operation;
shutdown;
unoccupied operation;
seasonal changeover;
manual operation;
controls set-up and programming;
troubleshooting;
alarms; and
final sequences of operation.
8.5.7
E
NERGY
M
ANAGEMENT
M
ANUAL
The details shall include:
descriptions of the final design intent and basis of design,
including brief descriptions of each system;
final sequences of operations for all equipment;
procedures for seasonal start-up and shutdown, manual and
restart operation;
as-built control drawings;
for all energy-saving features and strategies, rationale description,
operating instructions, and caveats about their function and
maintenance relative to energy use;
recommendations and brief method for appropriate accounting of
energy use of the whole building;
specifications for re-calibration frequency of sensors and actuators
by type and use;
recommendations for continuous commissioning or recommended
frequency for re-commissioning by equipment type, with reference
to tests conducted during initial commissioning;
recommendations regarding seasonal operational issues affecting
energy use;
list of all user-adjustable set points and reset schedules, with a
discussion of the purpose of each and the range of reasonable
adjustments with energy implications;
schedules of frequency for reviewing the various set points and
reset schedules to ensure they still are near optimum;
list of time-of-day schedules and a frequency to review them for
relevance and efficiency;
guidelines for establishing and tracking benchmarks for building
energy use and primary plant equipment efficiencies;
guidelines for ensuring that future renovations and equipment
upgrades will not result in decreased energy efficiency and will
maintain the design intent;
list of diagnostic tools, with a description of their use, that will
assist facility staff for the building in operating equipment more
efficiently;
a copy of the commissioning report; and
index of all commissioning documents with notation as to their
location.