Page 112

4

E

NERGY

U

SE

4.4

P

ROVISIONS FOR

E

NERGY

M

ANAGEMENT

E

U

10 T

ESTING AND

C

OMMISSIONING

E

XCLUSIONS

None.

O

BJECTIVE

Commissioning the electrical and mechanical systems to ensure the

impact on energy use of the systems is adequate, the systems

performance is as specified and the systems operation is as intended.

C

REDITS ATTAINABLE

4 + 1 BONUS

P

REREQUISITES

None.

C

REDIT REQUIREMENT

a) Commissioning specifications

1 credit for provision of appropriate specifications and/or cost provisions

in contract documents detailing the commissioning requirements for all

systems and equipment that impact on energy use and indoor

environmental quality.

b) Commissioning plan

1 credit for the appointment of a commissioning authority and provision

of a detailed commissioning plan that embraces all specified

commissioning work.

c) Commissioning

1 credit for ensuring full and complete commissioning of all systems,

equipment and components that impact on energy use and indoor

environmental quality.

d) Commissioning report

1 credit for providing fully detailed commissioning reports for all systems,

equipment and components that impact on energy use and indoor

environmental quality.

e) Independent Commissioning Authority

1 BONUS credit for engagement of an independent commissioning

authority in the Testing and Commissioning process.

A

SSESSMENT

a) Commissioning specifications

The Client shall submit copies of detail specifications on the

commissioning requirements for each system and equipment, and/or the

details of the cost provisions for the commissioning work.

The credit shall be awarded where it can be shown that the

specifications meet the requirements given in Section 8.5.1 as a

minimum or cost provisions are sufficient to carry out the intended work.

b) Commissioning plan

There shall be appropriate cost provisions for the appointment of a

commissioning authority and for the commissioning processes. The

commissioning authority shall be a Registered Professional Engineer

with adequate expertise in the commissioning of electrical and

mechanical systems, equipment and components. A suitably qualified

member of the organization that performed the design may act as the

commissioning authority. Reporting of all conditions and findings must be

immediate and direct from the commissioning authority to the Client. The

commissioning authority shall be responsible for:

review and approval of commissioning specifications;

the development of a commissioning plan; and