Table of Contents Table of Contents
Previous Page  136 / 248 Next Page
Basic version Information
Show Menu
Previous Page 136 / 248 Next Page
Page Background

BEAM P

LUS FOR

N

EW

B

UILDINGS

E

NERGY

U

SE

(E

U

)

V

ERSION

1.2

E

U

11 O

PERATION AND

M

AINTENANCE

Copyright © 2012 BEAM Society Limited. All rights reserved.

Page 115

4

E

NERGY

U

SE

4.4

P

ROVISIONS FOR

E

NERGY

M

ANAGEMENT

E

U

11 O

PERATION AND

M

AINTENANCE

E

XCLUSIONS

None.

O

BJECTIVE

Enable building operators to implement the design intent, be able to

monitor the performance of the building, and maintain the performance.

C

REDITS ATTAINABLE

3

P

REREQUISITES

None.

C

REDIT REQUIREMENT

a) Operations and maintenance manual

1 credit for providing a fully documented operations and maintenance

manual to the minimum specified.

b) Energy management manual

1 credit for providing fully documented instructions that enable systems

to operate at a high level of energy efficiency.

c) Operator training and operation and maintenance facilities

1 credit for providing training for operations and maintenance staff to the

minimum specified; and demonstrating that adequate maintenance

facilities are provided for operations and maintenance work.

A

SSESSMENT

The Client shall submit details of the provisions for operation and

maintenance as outlined below.

a) Operations and maintenance manual

The design intent and basis of design shall be included as a defining part

of the operations and maintenance manual and the energy management

manual. The manual shall include the details given in Section 8.5.6 as a

minimum.

Where an adequate contract sum was provided for the preparation of

comprehensive operations and maintenance manual, and the manual

covers adequately the major energy consuming building services

systems and equipment the credit shall be awarded.

b) Energy management

Where the operations and maintenance manual, or a dedicated energy

management manual is provided, and meets the requirements of Section

8.5.7 as a minimum, the credit shall be awarded.

c) Operator training and operation and maintenance facilities

The training program shall cover as a minimum the items listed in

Section 8.5.8. Details of the facilities for operation and maintenance,

such as the workshop(s), office accommodation, computing facilities etc.,

shall be provided, and the case made to demonstrate the adequacy of

the facilities in relation to the size and complexity of the building served.

Where the Client can verify that training of the building’s operations and

maintenance staff was undertaken for all commissioned systems and

major equipment, using the operations and maintenance manual, and

the energy management manual as the basis for the training, and

demonstrate that the provided operation and maintenance facilities are

adequate, the credit shall be awarded.

B

ACKGROUND

Facilities to carry out basic maintenance and equipment for monitoring

consumption can help improve operating efficiency and environmental