BEAM P
LUS FOR
N
EW
B
UILDINGS
E
NERGY
U
SE
(E
U
)
V
ERSION
1.2
E
U
7 A
IR
-
CONDITIONING
U
NITS
Copyright © 2012 BEAM Society Limited. All rights reserved.
Page 108
4
E
NERGY
U
SE
4.3
E
NERGY
E
FFICIENT
E
QUIPMENT
E
U
7 A
IR
-
CONDITIONING
U
NITS
E
XCLUSIONS
Buildings not using window and/or split-type air-conditioners.
O
BJECTIVE
Ensure the installation of air-conditioning units provides for near optimum
performance.
C
REDITS ATTAINABLE
1
P
REREQUISITES
Proper disposal system for the drainage of the condensation shall be
provided in accordance with Buildings Department requirements [1].
C
REDIT REQUIREMENT
1 credit for complying with the recommended installation positions for air-
conditioning units with regard to internal spaces; complying with the
minimum width of any external recess with regard to heat rejection; and
complying with the items listed in the assessment checklists.
A
SSESSMENT
i) Window type air-conditioning units
The Client shall provide relevant drawings and specifications
demonstrating that the air-conditioning units installed comply with the
installation requirements given in Tables 8.4 and 8.5 in Section 8.4.
ii) Split-type air-conditioning units
The Client shall provide relevant drawings and specifications
demonstrating that the air-conditioning units installed comply with the
relevant dimensions given in Table 8.4 in respect of internal unit, and
with the relevant dimensions given in Table 8.5 in respect of the external
unit.
Compliance with the requirements shall be demonstrated for each type
of domestic unit in a block, or each type of space or room in other types
of premises, unless the Client can demonstrate either that circumstances
mitigate against compliance in not more than 10% of installations, or that
non-compliance will not affect the performance of air-conditioning units in
respect of room cooling, or heat rejection.
The Client shall confirm that the installation conforms with any four of the
following items that are relevant to the type of air-conditioning units used:
to reduce penetration of noise units shall be located on walls which
do not face major noise sources (road traffic, major pedestrian
walkways, playgrounds, etc);
to reduce intake of polluted air units shall be located in walls such
that air is not drawn in from pollution sources such as roads,
commercial activities, etc;
for improved acoustics properties and better circulation, the internal
discharge shall be close to the centre of the wall in which it is
located;
for the purpose of reducing noise from rain, and to reduce the
potential for water dripping on to lower units, slabs shall be provided
as support and as cover;
to encourage proper maintenance, the installation of units shall be
such as to allow for safe and convenient removal;
where air-conditioning units are provided by the developer, the units
1
Buildings Department. Practice Note for Authorized Persons, Registered Structural Engineers and Registered
Geotechnical Engineers. PNAP No. APP-112 Disposal of Condensation from Air-Conditioning Units.
http://www.bd.gov.hk/english/documents/pnap/APP/APP112.pdf