commissioning procedures for Government buildings [6].

Effective commissioning and proper instructions on operations and

maintenance procedures have been shown to improve the operating

efficiency and environmental performance of a building over its life cycle.

The T&C requirements should cover all renewable systems, water

conservation systems, building services systems (particularly the energy

system) related to the BEAM Plus including the BMS/BAS system and all

hydraulic systems. Examples of HVAC systems include, but are not

limited to:

chillers;

cooling towers;

controls for central plant and for HVAC, including, if present, the

energy management system or building automation system (BAS);

unitary and split-air conditioners;

fans;

pumps;

heat exchangers;

boilers;

domestic hot water and hot water heaters;

ducts and associated dampers;

piping and associated valves; and

waste heat recovery, thermal storage, etc.

The Commissioning Agent need to prepare a Commissioning Plan with

details of how the review and testing will be carried out. His work should

complement and not cross over the responsibility of the building

services/BMS designers who also have commissioning responsibility.

6

Architectural Services Department, Building Services Branch. Testing and Commissioning Procedure No.1 for Air-

conditioning, Refrigeration, Ventilation and Control System in Government Buildings.

http://www.archsd.gov.hk/english/publications/publication_pdf/e70.pdf