Table of Contents Table of Contents
Previous Page  74 / 210 Next Page
Basic version Information
Show Menu
Previous Page 74 / 210 Next Page
Page Background

BEAM P

LUS

I

NTERIORS

C

OMMERCIAL

, R

ETAIL

A

ND

I

NSTITUTIONAL

M

ATERIALS

A

SPECTS

(MA)

MA 8 S

USTAINABLE

I

NTERNAL

W

ALL AND

D

OOR

P

RODUCTS

Copyright © BEAM Society Limited. All rights reserved. Page 73

b.) Impact identification

c.) System of EMS review

d.) Environmental audit system

f.) Environmental training

g.) Assigned responsible

staff for environmental

aspect

For products which are manufactured or assembled in different

manufacturing facilities or factories, all facilities shall be including in

this Assessment.

For All Sections

Only newly installed

walls

and door products shall be assessed.

Alternatively, 3 credits shall be achieved where the Applicant obviates

the material requirement, through design, such that no new

construction materials were installed.

Documentation

Credit(s) shall be achieved when the Applicant provides the

documentation stated below, to demonstrate criteria compliance:

a) Rapidly Renewable Materials/ Recycled Materials /

Sustainable Timber

i.

A summary table to show the product items, manufacturers,

quantities, percentage of rapidly renewable / recycled /

sustainable timber content and reference sources;

ii.

Drawings, layout, sections, and elevations for the walls and

doors;

iii.

Product catalogues or technical sheets with description to

substantiate the content;

iv.

Record Photographs for existing or newly installed walls and

doors;

b) Regionally Manufactured Materials

i.

A summary table showing the product types, manufacturers,

manufacture locations, quantities, percentage of locally

manufactured products and reference sources;

ii.

Delivery Notes, manufacturer’s location, quantity, etc.

c) Environmentally Manufactured Materials

i.

A summary table to show the product types, manufacturers,

quantities;

ii.

EMS Manual or certificate of the manufacturer.

ORIGINATE FROM

DIFFERENT LOCATIONS

,

C

HECK

-L

IST AND

E

QUATION

Check-List

The following items shall be included under this assessment:

a.) Wall and it’s covering

b.) External/Structural Wall

covering only

c.) Doors

d.) Trimming

e.) Levelling

f.) Bracing

g.) Framing

* Only single side area shall be counted.

Structural elements, fenestration, furniture, mechanical and electrical

installations and any other elements which are not listed above are

excluded from this assessment.