The EMS shall fully cover the following:

a.) Environmental policy

b.) Impact identification

c.) System of EMS review

d.) Environmental audit system

e.) Objective & Target

f.) Environmental training

g.) Assigned responsible

staff for environmental

aspect

For products which are manufactured in different manufacturing

facilities or factories, ALL shall be including in this Assessment.

Use the equation 3 to determine compliance.

For All Sections

Only the new construction work is assessed.

Alternatively:

3 credits shall be achieved where the Applicant obviates the material

and transportation, through design, such that no new construction

materials were installed.

Documentation

Credit(s) shall be achieved when the Applicant provides the

documentation stated below, to demonstrate criteria compliance:

a) Rapidly Renewable Materials / Recycled Materials /

Sustainable Timber

i.

summary table with items, manufacturer, quantities,

percentage of rapidly renewable / recycled / sustainable

timber content, reference sources;

ii.

Drawings, ceiling layout plan, section, elevations, details for

ceiling;

iii.

Product catalogues or technical sheets;

iv.

Record photographs for existing or newly installed ceiling;

b) Regionally Manufactured Materials

i.

A summary table showing the product types, manufacturer,

manufacturing locations, quantities, percentage of locally

manufactured products and reference sources;

ii.

Delivery Notes, with manufacturer’s location, quantity, etc.

c) Environmentally Manufactured Materials

i.

A summary table to show the product types, manufacturers,

quantities;

ii.

EMS Manual or EMS certificate(s) for ALL organizations;

C

HECKLIST

Check-List

The following items shall be included under this assessment :

a.) Ceiling Tiles

b.) Hangers

c.) Trimming

d.) Levelling

e.) Framing

f.) Bracing

g.) Ceiling Support

h.) Secondary Grid

i.) Bulkhead

j.) Shadow Gap Infill

k.) Access panels

Structural elements, fenestration, walls, partitions, doors, furniture,

mechanical and electrical installations and any other elements which

are not listed above are excluded under this assessment.