The EMS shall fully cover the following:
a.) Environmental policy
b.) Impact identification
c.) System of EMS review
d.) Environmental audit system
e.) Objective & Target
f.) Environmental training
g.) Assigned responsible
staff for environmental
aspect
For products which are manufactured in different manufacturing
facilities or factories, ALL shall be including in this Assessment.
Use the equation 3 to determine compliance.
For All Sections
Only the new construction work is assessed.
Alternatively:
3 credits shall be achieved where the Applicant obviates the material
and transportation, through design, such that no new construction
materials were installed.
Documentation
Credit(s) shall be achieved when the Applicant provides the
documentation stated below, to demonstrate criteria compliance:
a) Rapidly Renewable Materials / Recycled Materials /
Sustainable Timber
i.
summary table with items, manufacturer, quantities,
percentage of rapidly renewable / recycled / sustainable
timber content, reference sources;
ii.
Drawings, ceiling layout plan, section, elevations, details for
ceiling;
iii.
Product catalogues or technical sheets;
iv.
Record photographs for existing or newly installed ceiling;
b) Regionally Manufactured Materials
i.
A summary table showing the product types, manufacturer,
manufacturing locations, quantities, percentage of locally
manufactured products and reference sources;
ii.
Delivery Notes, with manufacturer’s location, quantity, etc.
c) Environmentally Manufactured Materials
i.
A summary table to show the product types, manufacturers,
quantities;
ii.
EMS Manual or EMS certificate(s) for ALL organizations;
C
HECKLIST
Check-List
The following items shall be included under this assessment :
a.) Ceiling Tiles
b.) Hangers
c.) Trimming
d.) Levelling
e.) Framing
f.) Bracing
g.) Ceiling Support
h.) Secondary Grid
i.) Bulkhead
j.) Shadow Gap Infill
k.) Access panels
Structural elements, fenestration, walls, partitions, doors, furniture,
mechanical and electrical installations and any other elements which
are not listed above are excluded under this assessment.