

BEAM Plus Interiors
Commercial, Retail and Institutional
Submission Template for EU 5
Metering and Monitoring
Copyright © 2013 BEAM Society Limited. All rights reserved.
Page 1 of 1
Credit Requirements:
a) 3 credits for electricity sub-system monitoring with sub-meters (irrespective of
ownership) of the prescribed engineering systems
b) 1 credit for chilled water energy monitoring with thermal energy meter
(irrespective of ownership) of the prescribed CHW system;
Credit Attainable:
4
Credit(s) anticipated for this submission:
Enclosure
Electricity Monitoring
Responsible person
Records with consumption records, BMS screenshot (if used); , T&C reports for all meters and CT’s
Manufacturer’s catalogue, technical data sheets, O&M manuals, for all meters, safety, and CT’s,
Drawings, engineering As-built electrical schematic, highlighting installed meter(s);
Record Photographs with ”as built” installed meter(s) highlighted
Chilled Water Monitoring
Responsible person
Records with consumption records, BMS screenshot (if used), T&C reports for all meters and all sensors;
Manufacturers catalogue, technical data sheets, and O&M manuals for all meters and all sensors;
Drawings, engineering As-built schematic, layouts, highlighting installed meter(s);
Record Photographs with ”as built” installed meter(s) highlighted
CT - Current Transformer