Table of Contents Table of Contents
Previous Page  191 / 210 Next Page
Basic version Information
Show Menu
Previous Page 191 / 210 Next Page
Page Background

BEAM Plus Interiors

Commercial, Retail and Institutional

Submission Template for EU 5

Metering and Monitoring

Copyright © 2013 BEAM Society Limited. All rights reserved.

Page 1 of 1

Credit Requirements:

a) 3 credits for electricity sub-system monitoring with sub-meters (irrespective of

ownership) of the prescribed engineering systems

b) 1 credit for chilled water energy monitoring with thermal energy meter

(irrespective of ownership) of the prescribed CHW system;

Credit Attainable:

4

Credit(s) anticipated for this submission:

Enclosure

Electricity Monitoring

Responsible person

Records with consumption records, BMS screenshot (if used); , T&C reports for all meters and CT’s

Manufacturer’s catalogue, technical data sheets, O&M manuals, for all meters, safety, and CT’s,

Drawings, engineering As-built electrical schematic, highlighting installed meter(s);

Record Photographs with ”as built” installed meter(s) highlighted

Chilled Water Monitoring

Responsible person

Records with consumption records, BMS screenshot (if used), T&C reports for all meters and all sensors;

Manufacturers catalogue, technical data sheets, and O&M manuals for all meters and all sensors;

Drawings, engineering As-built schematic, layouts, highlighting installed meter(s);

Record Photographs with ”as built” installed meter(s) highlighted

CT - Current Transformer