Table of Contents Table of Contents
Previous Page  184 / 210 Next Page
Basic version Information
Show Menu
Previous Page 184 / 210 Next Page
Page Background

BEAM Plus Interiors

Commercial, Retail and Institutional

Submission Template for MA 11

Demolition and Construction Waste Reduction

Copyright © 2013 BEAM Society Limited. All rights reserved.

Page 1 of 1

Credit Requirements:

1 credit for recycling at least 30% of demolition and construction waste by mass;

2 credits for recycling at least 60% of demolition and construction waste by mass;

Credit Attainable:

2

Credit(s) anticipated for this submission:

Enclosure

Summary Table (refer to sample below)

Records with trip tickets, recycling firm receipts, substantiating the waste and waste reductions

Site records with logbook (excel format) for waste stream, qty, type, sorting, storage, recycling, disposal;

Record photographs with process, storage, waste sorting and storage by contractor, collection by recyclers

Prescribed

Element

Recycled

C&D Waste (kg)

Overall Quantity

C&D Waste (kg)

a.) Demolished materials

b.) Plastics

c.) Paper and cardboard packaging

d.) Metals

e.) Timber

f.) General refuse

Sub Total

Percentage C&D Waste Recycled (%)