

BEAM Plus Interiors
Commercial, Retail and Institutional
Submission Template for MA 11
Demolition and Construction Waste Reduction
Copyright © 2013 BEAM Society Limited. All rights reserved.
Page 1 of 1
Credit Requirements:
1 credit for recycling at least 30% of demolition and construction waste by mass;
2 credits for recycling at least 60% of demolition and construction waste by mass;
Credit Attainable:
2
Credit(s) anticipated for this submission:
Enclosure
Summary Table (refer to sample below)
Records with trip tickets, recycling firm receipts, substantiating the waste and waste reductions
Site records with logbook (excel format) for waste stream, qty, type, sorting, storage, recycling, disposal;
Record photographs with process, storage, waste sorting and storage by contractor, collection by recyclers
Prescribed
Element
Recycled
C&D Waste (kg)
Overall Quantity
C&D Waste (kg)
a.) Demolished materials
b.) Plastics
c.) Paper and cardboard packaging
d.) Metals
e.) Timber
f.) General refuse
Sub Total
Percentage C&D Waste Recycled (%)