

BEAM P
LUS
I
NTERIORS
C
OMMERCIAL
, R
ETAIL
A
ND
I
NSTITUTIONAL
I
NTRODUCTION
Copyright © BEAM Society Limited. All rights reserved. Page 11
Fixtures & Finishes
Installation methods
Flooring (carpeted / tiled / reconstituted, etc.)
Ceiling (exposed / false ceiling)
Walls/
partitions 1Doors (internal / entrances)
Paints / adhesives, etc. (wall, floor, ceiling)
Fixed furniture (reception, pantry, cabinets, etc.)
Acoustic panels / signage
Furniture & Fittings
Workstations / desks
Conference tables / coffee tables
Chairs / seating
Planter boxes
Blinds / curtains / solar glazing film
Electrical Installations
MCB board / power cabling
Power & ELV wiring / trunking / conduits
Power points / outlets / sockets
Lighting panels / luminaires / switching
Fixed lamps / control ballasts
Desk / task / spot lighting
Photo sensor / control panel
Telephone / IT conduit points
Security system / emergency signage
Entrance call bell / motorised doors
Energy metering systems
MVAC Installations
Supply / return air ducts / grilles
Fan coils / VAV boxes
Air handling units / exhaust systems
Motors / insulation
Thermostatic / motion / user controls
Energy metering systems
Plumbing & Drainage / Fire Services
Pantry / sink / drinking water points
Water check meter
Sprinkler heads / piping
Alarm system / conduit / wiring
Portable extinguishers
Hose reel / pre-action hydrant cabinets
Appliances
Computer / server / telecoms / IT
Pantry (refrigerator, heater, oven, etc.)
Drinking fountain
Air purifiers (pantry and printing room)
Food waste decomposer / green wall
1.2.7 A
SSESSMENT
C
OVERAGE
The scope of BEAM Plus Interiors is typically confined to the factors
over which the Applicant has direct control. For the most part this is
defined by the footprint or boundary of th
e project spacedefined in the
1 Where used in this manual Partition or Partitions shall use the definition in th
e Appendix