8.2 B

ASELINE

B

UILDING

M

ODEL

Copyright © 2012 BEAM Society Limited. All rights reserved.

A - 11

that Air-conditioners will not be used in other months in the year.

8.2.6 I

NTERNAL

L

OADS

The lighting power intensities to be used for various types of premises in

the Baseline Building model shall be the threshold compliance values as

stipulated in the Building Energy Code (BEC 2012) applicable to the types

of premises. For those types of premises that the Building Energy Code

(BEC 2012) does not cover, the values in Table 8.3 should be used.

The equipment power density shall be modelled as designed. The

equipment power reduction in Assessed Building model must be

documented by an exceptional calculation method: the applicants must

provide justification for assumptions used in both the Baseline Building

model and the Assessed Building model, supported by following:

• Side-by-side comparison of local industry standard equipment and

new proposed equipment, with energy efficiency metric for each piece

of equipment (e.g., kWh/ pound of material processed);

• List of modifications that make new equipment more efficient;

• Operation schedules for facility and equipment.

T

ABLE

8.3

B

ASELINE

B

UILDING

L

IGHTING

P

OWER

D

ENSITY FOR VARIOUS PREMISES

Type of Premises

Lighting

power

intensity

(W/m²)

Residential flat

Bedroom

13

Living/dinning room

15

Entrance Lobby

15

Lift Lobby

12

Lift Car

13

Corridor

10

Staircase

8

Plant / Machine / Switch Room

12

Kitchen

15

Bathroom

13

School

Classroom/ Laboratory

15

Library

15