Table of Contents Table of Contents
Previous Page  117 / 248 Next Page
Basic version Information
Show Menu
Previous Page 117 / 248 Next Page
Page Background

BEAM P

LUS FOR

N

EW

B

UILDINGS

V

ERSION

1.2

E

NERGY

U

SE

(E

U

)

E

U

1 O

PTION

2 A

LTERNATIVE

R

OUTE

: P

ASSIVE

D

ESIGN

Copyright © 2012 BEAM Society Limited. All rights reserved.

Page 96

4

E

NERGY

U

SE

4.1

A

NNUAL

E

NERGY

U

SE

E

U

1

- O

PTION

2 A

LTERNATIVE

R

OUTE

: P

ASSIVE

D

ESIGN

E

XCLUSIONS

None

O

BJECTIVE

Passive building design allows buildings to respond to the local climate;

reducing the reliance on active servicing for human comfort. This in turn

reduces energy consumption and associated carbon dioxide emissions.

This alternative route considers:

Site planning and building orientation;

Envelope heat transfer;

Natural ventilation;

Daylight design; and

Common area servicing.

It encompasses EU1: Reduction of CO

2

Emissions, EU2: Peak Electricity

Demand Reduction and EU13: Energy Efficient Building Layout from the

conventional assessment; these credits should not be assessed when

following this route to prevent double counting.

This passive design route was developed for residential buildings and

their unique operating criteria, so it is not applicable to non-residential

buildings.

C

REDITS ATTAINABLE

20

P

REREQUISITES

Eu P1 Minimum Energy Performance.

C

REDIT REQUIREMENT

Passive Building Design

(a) Site Planning/Building Orientation

Site Planning

1 credit attained if the permeability of the site is in accordance

with APP 152.

2 credits attained if the permeability of the site is 33% or more in

both projection planes in accordance with APP 152.

Alternatively the second credit can be achieved by:

Carrying out a performance assessment to show an

improvement in ventilation performance for the proposed case

compared with a site with a permeability of 33%.

Building Orientation

1 credit attained if the average solar irradiation of all facades is ≤

80% of baseline solar irradiation value of 395 kWhr/m

2

/ apr-oct.

(b) Building Envelope

Prescriptive Approach

1 credit if 28.0 W/m

2

≤ OTTV < 30.0 W/m

2

.

2 credits if 26.0 W/m

2

≤ OTTV < 28.0 W/m

2

.

3 credits if 24.0 W/m

2

≤ OTTV < 26.0 W/m

2

.

4 credits if 22.0 W/m

2

≤ OTTV < 24.0 W/m

2

.

5 credits if 20.0 W/m

2

≤ OTTV < 22.0 W/m

2

.