Table of Contents Table of Contents
Previous Page  113 / 248 Next Page
Basic version Information
Show Menu
Previous Page 113 / 248 Next Page
Page Background

BEAM P

LUS FOR

N

EW

B

UILDINGS

E

NERGY

U

SE

(E

U

)

V

ERSION

1.2

Copyright © 2012 BEAM Society Limited. All rights reserved.

Page 92

4.4 P

ROVISIONS FOR

E

NERGY

M

ANAGEMENT

E

U

10

T ESTING AND C OMMISSIONING

E

U

11

O PERATION AND M AINTENANCE

E

U

12

M ETERING AND M ONITORING

B

ACKGROUND

One of the major reasons why buildings fail to meet performance

expectations is the lack of adequate commissioning of systems and

equipment, and the inadequacy of operations and maintenance manuals,

commissioning data, and as-installed equipment data, as-fitted drawings,

and operator training.

The installations considered in this section include the systems,

equipment and components of the electrical and mechanical plant in the

building development that have significant influence on energy

consumption, electricity maximum demand and, to a lesser extent indoor

environmental conditions. Indoor environmental conditions are verified in

a series of tests which may be regarded as ‘enhanced commissioning’

and which are detailed in the section covering indoor environmental

quality.

The Client should implement and execute a commissioning process that

starts with performance requirements and ends with commissioning

records for all energy related systems and equipment. The details of all

systems, equipment and components, operating instructions, set points

and results of all testing and commissioning should be provided to the

building operator in a comprehensive and well organised operation and

maintenance manual.

4.5 B

UILDING

D

ESIGN

FOR

E

NERGY

E

FFICIENCY

E

U

13 E

NERGY

E

FFICIENT

B

UILDING

L

AYOUT

B

ACKGROUND

Through planning and architectural design, it is possible to improve the

building energy efficiency. This section is to address various strategies in

terms of building orientation, layout plan, external shading devices, such

that the building energy consumption would be reduced.

R

EFERENCES

Energy Efficiency and Conservation for Buildings

[7].

Guidelines on Energy Audit. April 2004 [8].

Guidelines on T5 Fluorescent Lamps

[9].

Application Guide to Electronic Ballasts

[10].

Application Guide to Variable Speed Drives (VSD)

[11].

Application Guide to Central Control and Monitoring Systems (CCMS)

[12].

7

http://www.emsd.gov.hk/emsd/e_download/pee/emsd100dpi.pdf

8

http://www.emsd.gov.hk/emsd/eng/pee/em_pub.shtml

9

http://www.emsd.gov.hk/emsd/e_download/pee/t5guide.pdf

10

http://www.emsd.gov.hk/emsd/eng/pee/em_pub_1.shtml

11

http://www.emsd.gov.hk/emsd/eng/pee/em_pub_2.shtml

12

http://www.emsd.gov.hk/emsd/e_download/pee/ccms17.pdf