

BEAM P
LUS
I
NTERIORS
C
OMMERCIAL
, R
ETAIL
A
ND
I
NSTITUTIONAL
M
ANAGEMENT
(MAN)
MAN 1 BEAM P
ROFESSIONAL
Copyright © BEAM Society Limited. All rights reserved. Page 39
MAN 1 BEAM P
ROFESSIONAL
E
XCLUSION
None.
O
BJECTIVE
To facilitate the application for the BEAM certification process and to
ensure the design of the project following the requirement of the
BEAM Plus Manual.
C
REDIT ATTAINABLE
1
C
REDIT REQUIREMENT
1 credit for at least one (1) key member of the project consultants
being a certified BEAM Professional with BI accreditation.
A
SSESSMENT
Criteria
The Applicant shall provide evidence of engagement of the BEAM
Professional as the key project team member, and shall have BEAM
Plus Interiors credential to submit BEAM Plus Interiors project.
The BEAM Professional shall meet all of the following requirements:
i.
The BEAM Professional was accredited before the beginning
of construction;
ii.
An employee of a design firm, project manager, contractor, or
consultant engaged on the project;
iii.
Conducted at least one design charrette meeting at concept
stage;
iv.
Participated in meetings;
v.
Provide guidance to the project team regarding BEAM Plus
principles, structure, timing and certification process from
design through to practical completion of the project;
vi.
Supervised and submitted all documentation and materials in
accordance with this Manual;
Documentation
Credit shall be achieved when the Applicant provides the
documentation stated below, to demonstrate criteria compliance:
i.
nominated BEAM Pro’s accreditation certificate; or a printout
of the relevant page of the online directory, found on the
HKGBC website, signed and dated by the BEAM Pro, with
his/her name underlined;
ii.
letter of appointment endorsed/signed by the project manager
or the space owner, and identifying the scope of work.
iii.
records for meetings, design stage charrette, and written work
products for design team;