Table of Contents Table of Contents
Previous Page  40 / 210 Next Page
Basic version Information
Show Menu
Previous Page 40 / 210 Next Page
Page Background

BEAM P

LUS

I

NTERIORS

C

OMMERCIAL

, R

ETAIL

A

ND

I

NSTITUTIONAL

M

ANAGEMENT

(MAN)

MAN 1 BEAM P

ROFESSIONAL

Copyright © BEAM Society Limited. All rights reserved. Page 39

MAN 1 BEAM P

ROFESSIONAL

E

XCLUSION

None.

O

BJECTIVE

To facilitate the application for the BEAM certification process and to

ensure the design of the project following the requirement of the

BEAM Plus Manual.

C

REDIT ATTAINABLE

1

C

REDIT REQUIREMENT

1 credit for at least one (1) key member of the project consultants

being a certified BEAM Professional with BI accreditation.

A

SSESSMENT

Criteria

The Applicant shall provide evidence of engagement of the BEAM

Professional as the key project team member, and shall have BEAM

Plus Interiors credential to submit BEAM Plus Interiors project.

The BEAM Professional shall meet all of the following requirements:

i.

The BEAM Professional was accredited before the beginning

of construction;

ii.

An employee of a design firm, project manager, contractor, or

consultant engaged on the project;

iii.

Conducted at least one design charrette meeting at concept

stage;

iv.

Participated in meetings;

v.

Provide guidance to the project team regarding BEAM Plus

principles, structure, timing and certification process from

design through to practical completion of the project;

vi.

Supervised and submitted all documentation and materials in

accordance with this Manual;

Documentation

Credit shall be achieved when the Applicant provides the

documentation stated below, to demonstrate criteria compliance:

i.

nominated BEAM Pro’s accreditation certificate; or a printout

of the relevant page of the online directory, found on the

HKGBC website, signed and dated by the BEAM Pro, with

his/her name underlined;

ii.

letter of appointment endorsed/signed by the project manager

or the space owner, and identifying the scope of work.

iii.

records for meetings, design stage charrette, and written work

products for design team;