i.
introduces innovative designs, construction or operational
provisions that enhance environmental performance and are not
hitherto found in Hong Kong; or
ii.
achieves superior performance (performance enhancements)
greatly exceed the prevailing requirements in BEAM Plus
Interiors.
In such cases, the Applicant can submit proposals that:
i.
detail the proposed technology, and practice;
ii.
demonstrate how the technology / practice is implemented and
achieves the benefits that are claimed;
iii.
quantified data, using a life-cycle analysis or equal for the
anticipated performance gains;
iv.
provide actual performance data;
v.
justify the proposed method statement/assessment criteria;
IMPORTANT NOTE: The onus is on the Applicant to present
quantitative evidence of the performance compared to existing
requirements. Generic narratives that do not demonstrate performance
gains cannot be entertained. Incomplete or inadequate submissions will
increase administration and delay the assessment process.
The BAS shall refer every IV proposal to the BSL TRC, which will
consider each proposal on its merits and award points accordingly.
Any points gained under the Innovation category shall be regarded as
‘Innovation’ counting towards the total number of points obtained but not
towards the total points obtainable.
BSL maintains a database of successful Innovation submissions for
reference.
1.4.8 A
LTERNATIVE
A
SSESSMENT
M
ETHODS
BEAM Plus Interiors does not seek to be overly prescriptive in setting
requirements and compliance methods. As such, it is possible that some
projects may not be fully embraced by the current criteria due to their
unusual nature, or design. In such cases Applicants can consider an
alternative approach for the same objective, and submit a Credit
Interpretation Request (CIR) that details:
i.
the BEAM Plus Interiors objective (clause number) for which
recognition is being sought;
ii.
proposed alternative criteria;
iii.
proposed method for assessment;
The CIR detailing the proposal should be made at the earliest
opportunity. The CIR result, a ruling, shall be provided to accept, accept
with defined modifications, or reject the proposal, and all shall be binding
on the project assessment.
1.5 G
RADING
M
ETHODOLOGY
BEAM Plus provides authoritative guidance to all stakeholders in the
building construction and real estate sectors on practices that reduce the
adverse effects of buildings and fit-out project impacts on the
environment, whilst providing quality indoor environments for occupants.
1.5.1 P
RE
-
REQUISITE
C
REDITS
Green building certification encourages the entire industry to set higher
standards than the minimum code or regulatory requirements.
Compliance with codes, legal, regulatory and statutory requirements is a
condition of project approval by the authority having jurisdiction, and as
such shall not be assessed under BEAM Plus.
However, BEAM Plus Interiors has pre-requisites for several key