Table of Contents Table of Contents
Previous Page  162 / 210 Next Page
Basic version Information
Show Menu
Previous Page 162 / 210 Next Page
Page Background

BEAM Plus Interiors

Commercial, Retail and Institutional

Submission Template for MAN 2

Construction IAQ Management

Copyright © 2013 BEAM Society Limited. All rights reserved.

Page 1 of 1

Credit Requirements:

1 credit for implementing mitigation measures to reduce potential IAQ problems

arising from demolition, dismantling, and removal of materials , etc. during fit-out

activities;

Credit Attainable:

1

Credit anticipated for this submission:

Enclosure

List Responsible Person

Construction IAQ Management documentation with plan, threat, method statements, solutions;

Records with logbook/records during construction programme;

Drawings with floor layout plans, sections, elevations, with measures highlighted

Drawings, engineering with floor plans, sections, details, with measures highlighted

Record photographs with site progress, “as built” works