

BEAM Plus Interiors
Submission Summary Sheet
Copyright © 2013 BEAM Society Limited. All rights reserved.
Page 4 of 4
IMPORTANT NOTES:
1. The Applicant shall complete the master template, with the overall credit summary, the room schedule, and
required project information, can only be shall be signed by a BEAM Professional, with BI accreditation.
2. The Applicant shall submit one template for every prerequisite and individual credit. Submissions without
prerequisites will not be assessed.
3. The Applicant shall provide ALL listed documentation on the template to support their application. Partial/split
submissions shall NOT be permitted.
4. In the event that list on the template not sufficient for your project, provide supplementary page, clearly labelled
and identified.
5. Submission materials for each template may comprise tables, report(s), drawing(s), calculation(s), catalogue data,
commissioning records, record photographs, etc. ALL signed, and dated, by the relevant authority. For example
all submission under Commissioning shall be dated and signed by the project ICxA.
6. Submissions with different types of material, for example summary table, drawings and photograph, SHALL be
clearly identified and cross-referenced.
7. Where multiple page documents, for example a product catalogue or other material, is submitted containing
pages with different model, or types, it shall be the Applicant’s responsibility to clearly identify and highlight the
item(s) used in the project, and its technical data.
8. All Innovation (IV) submissions shall stipulate coverage, scope, quantitative environmental benefits, and
references to be reviewed.