Page 117

6

IEQ

6.3

I

NDOOR

A

IR

Q

UALITY

I

EQ

6 C

ONSTRUCTION

IAQ M

ANAGEMENT

E

XCLUSIONS

Residential and similar buildings not provided with central air-

conditioning and ventilation systems.

O

BJECTIVE

Ensure that building users are not affected and ventilation systems are

not contaminated during renovation work.

C

REDITS ATTAINABLE

1

P

REREQUISITES

If applicable, compliance with the Air Pollution Control Ordinance with

regard to asbestos control.

C

REDIT REQUIREMENT

1 credit for availability and effective implementation of a Construction

IAQ Management.

A

SSESSMENT

To demonstrate compliance the Client shall submit a report prepared by

a suitably qualified person documenting effective implementation of

Construction IAQ Management appropriate to the scale and extent of the

work.

Where renovations require the removal or treatment of asbestos

containing materials the work shall be carried out in accordance with the

instructions given by the Environmental Protection Department [1].

Where due attention has been paid to construction IAQ management as

detailed in the checklist below, the credit shall be awarded.

C

HECK LIST

Written Construction IAQ Management procedures should exist which

shall meet or exceed the minimum requirements, as follows:

details of the procedures adopted during renovation, fit-out and

redecoration;

contract documentation that demonstrates implementation of the

construction IAQ management measures;

operation and maintenance measures in place during construction

work;

measures to avoid contamination of adjacent normally occupied

areas;

measures to avoid contamination of common areas or public areas,

including outside areas;

contaminant source control;

provision of adequate outside air continuously during installation of

materials and finishes;

evidence of measures providing protection of ducts, on-site storage

or protection of installed absorptive materials, etc;

cleaning procedures to be employed prior to the building being

occupied, in the event that ventilation system components and air

pathways are not adequately protected;

details of any procedures for building flush-out; and

replacement of all construction-related filtration media used on

permanent HVAC equipment at substantial completion of the work.

1

Environmental Protection Department

Environmental Asbestos Control

http://www.epd.gov.hk/epd/english/environmentinhk/air/guide_ref/asbestos_control_02.html#removeasbestos