Page 56

up causing suffocation to death; and

increase in turbidity of the receiving water which may adversely

affect the ecosystem.

Prior to making a discharge, the responsible person for the discharge

should submit an application to EPD for a discharge license. Under the

Water Pollution Control Ordinance, it is an offence to discharge polluting

matter in a water control zone without a valid license, or to discharge

effluent in breach of the terms and conditions specified in the discharge

license granted by the Authority. The contractor has the responsibility to

ensure compliance with all legislative control requirements. Apart from

obtaining a valid discharge license before the commencement of any

discharge, the contractor must take all necessary steps to comply with

the terms and conditions of the license. This requires due consideration

to be given at the planning stage of a construction project. Attention

should be paid to the wastewater characteristics, to minimise the quantity

of pollution loads (both in terms of flow and concentration), plan and

install proper site drainage to intercept stormwater run-off from outside

the side and collect silt carrying site run-off to silt removal facilities;

design and construct appropriate wastewater treatment facilities, provide

the necessary training to the site personnel as well as constant on-site

supervision and monitoring of the environmental performance. All

wastewater treatment facilities should be well maintained to achieve the

desired performance.