1 credit for conducting an AVA by wind tunnel or Computational Fluid Dynamics
(CFD) according to the prevailing AVA methodology introduced by the
Government demonstrating the optimal option is selected in comparing with
different options.
1
S
A
9 N
EIGHBOURHOOD
D
AYLIGHT
A
CCESS
1 credit for designs for which the access to daylight of neighbouring sensitive
buildings is maintained to the prescribed level.
Buildings where
daylight is of no value
to neighbouring
properties.
1
S
A
10 E
NVIRONMENTAL
M
ANAGEMENT
P
LAN
1 credit for demonstrating that an Environmental Management Plan for
demolition/construction including Environmental Monitoring and Auditing has
been implemented.
None.
1
S
A
11 A
IR
P
OLLUTION
D
URING
C
ONSTRUCTION
1 credit for applying adequate mitigation measures for dust and air emissions
during the construction as recommended by the Environmental Protection
Department; and demonstrating compliance with the air quality management
guidelines as detailed in the Environmental Monitoring and Audit Manual.
None.
1
S
A
12 N
OISE
D
URING
C
ONSTRUCTION
1 credit for providing adequate mitigation measures for construction noise for all
Noise Sensitive Receivers.
None.
1
S
A
13 W
ATER
P
OLLUTION
D
URING
C
ONSTRUCTION
1 credit for undertaking adequate measures to reduce water pollution during
construction.
None.
1
S
A
14 N
OISE FROM
B
UILDING
E
QUIPMENT
1 credit for demonstrating that the level of the intruding noise at the facade of the
potential noise sensitive receivers is in compliance with the criteria
recommended in the Hong Kong Planning Standards and Guidelines.
None.
1
S
A
15 L
IGHT
P
OLLUTION
1 credit for demonstrating that obtrusive light from exterior lighting meets the
specified performance for the environmental zone in which the building
development is located.
None.
1
3
M
ATERIALS
A
SPECTS
(M
A
)
22+1B
M
A
P1 T
IMBER
U
SED FOR
T
EMPORARY
W
ORKS
Virgin forest products are not used for temporary works during construction.
None.
Required
M
A
P2 U
SE OF
N
ON
-CFC B
ASED
R
EFRIGERANTS
Using non-chlorofluorocarbon (CFC)-based refrigerants in HVAC&R systems.
None.
Required