Section 14(3) of the Waterworks Ordinance (Chapter 102) empowers the

Water Authority to prescribe the manner of construction or installation

and the nature, size and quality of the pipes and fittings of an inside

service or fire service for water supplies. All plumbing proposals for

inside service and fire service are therefore subject to the approval of the

Water Authority [5]. The Hong Kong Waterworks Standard Requirements

is a set of normal requirements which are applicable to the installation of

inside service and fire service in addition to the requirements that are set

out in Schedule 2 of the Waterworks Regulations (Chapter 102) or

modified under Regulation 25(1). Where necessary, additional

requirements may also be imposed on an individual application for water

supply, depending on the nature and type of the plumbing installations.

S

AMPLING

Part 6 of ISO 5667 [2] establishes detailed principles to be applied to the

design of sampling programmes, to sampling techniques and to the

handling and preservation of samples of drinking water and water used

for food and beverage processing (drinking water). It is important that the

sampling purpose be defined as accurately as possible and that the

measurements provide the required information in the most efficient and

statistically representative manner.

5

Water Supplies Department. Hong Kong Waterworks Standards for Plumbing Installations in Buildings.

http://www.wsd.gov.hk/filemanager/en/content_149/hkwsre.pdf