Table of Contents Table of Contents
Previous Page  58 / 210 Next Page
Basic version Information
Show Menu
Previous Page 58 / 210 Next Page
Page Background

BEAM P

LUS

I

NTERIORS

C

OMMERCIAL

, R

ETAIL

A

ND

I

NSTITUTIONAL

M

ATERIALS

A

SPECTS

(MA)

MA 2

I

NTERIOR

C

OMPONENTS

R

EUSE

Copyright © BEAM Society Limited. All rights reserved. Page 57

MA 2 I

NTERIOR

C

OMPONENTS

R

EUSE

E

XCLUSION

None.

O

BJECTIVE

Extend the life cycle of the existing wall, doors, and glazing in the

premises to conserve resources, reduce waste, and lower the

environmental impact.

C

REDIT ATTAINABLE

3

C

REDIT REQUIREMENT

1 credit for reusing at least 30% of prior condition walls, glazing,

doors, ceilings, and flooring.

2 credits for reusing at least 50% of prior condition walls, glazing,

doors, ceilings, and flooring.

3 credits for reusing at least 70% of prior condition walls, glazing,

doors, ceilings, and flooring.

A

SSESSMENT

Criteria

The Applicant shall schedule and quantify the existing and reused

elements, based on the total surface area.

To determine the total reused portion, divide the total area of reused

elements by the total area of elements at prior condition.

Important Note:

in this Manual, the terms

partition

and

wall

have

individual meaning and are defined separately.

(The boundary wall of the premises including the building envelope of

the host building, and the shared/party wall with the host building

common area and the shared/party wall with adjacent units are not

included).

Documentation

Credit(s) shall be achieved when the Applicant provides the

documentation stated below, to demonstrate compliance:

i. summary table, with each construction element,

description, total area, reused area, reused percentage

calculation, descriptions of the methodologies and steps

adopted to retain the reused items;

ii. drawings, floor /ceiling plans, elevations, sections,

details, quantifying the total and reused areas;

iii. record photographs including pre-construction and post-

construction to demonstrate the elements that were

retained;

C

HECK

-L

IST AND

E

QUATION

The following items* shall be included under this assessment:

a.) Walls

b.) Glazing

c.) Ceilings

d.) Doors

e.) Flooring

f.) Existing wall coverings

* Only single side area shall be counted.

The building envelope, structural elements, building envelope

fenestration, shared/party walls,

partitions ,

furniture, mechanical and

electrical installations and any other elements which are not listed

above are excluded under this assessment.