Table of Contents Table of Contents
Previous Page  147 / 210 Next Page
Basic version Information
Show Menu
Previous Page 147 / 210 Next Page
Page Background

BEAM P

LUS

I

NTERIORS

C

OMMERCIAL

, R

ETAIL

A

ND

I

NSTITUTIONAL

A

PPENDICES

9.6 G

LOSSARY

Copyright © BEAM Society Limited. All rights reserved. Page 146

H

OST

B

UILDING

means the building or tower in a building which houses the

project space .

H

OST

B

UILDING

P

ROVISIONS

means those Building Services and systems provided by the building

owner / landlord for use by the Applicant in the occupied space being

assessed (typically including central air conditioning, fan coil units /

VAV terminals, lighting fixtures and controls, etc.).

H

YDRO

-

CHLOROFLUOROCARBONS

means chemical compounds (also known as HCFC) that cause ozone

depletion when released into the atmosphere.

H

YDRO

-

FLUOROCARBONS

HFCs are commonly used to replace HCFC refrigerants to reduce the

OPD, however HFCs refrigerants have a high GWP.

I

NDEPENDENT

C

OMMISSIONING

A

UTHORITY

(

ICXA

)

means the independent individual designated to review, oversee, and

inspect the entire commissioning process from initial planning to

completion. The iCxA should facilitate communication amongst the

owner, designer, and contractor to ensure that the systems are

installed and function in accordance with the design intent and

owner’s requirements.

I

NFILTRATION

means the uncontrolled air leakage into conditioned spaces through

unintentional openings in ceilings, floors, walls, building envelope, or

other openings.

I

NNOVATION

P

OINTS

Innovations points may be awarded in the Innovation category (not in

any of the other BEAM Plus Interior categories) where the BSL TRC

has approved the Applicant’s submission Innovation points will count

towards the total credits obtained, but not towards the total credits

obtainable.

I

NTERIORS

P

ROJECT

means a project that involves the planning, design, construction and

commissioning of the fit-out, renovation and refurbishment of internal

occupied spaces within a host building.

MERV

means the Minimum Efficiency Reporting Value (also known as

MERV). It is rating scale describing the effectiveness of air filters,

designed by the American Society of Heating, Refrigerating and Air-

conditioning Engineers, Inc. (ASHRAE).

M

ODULAR

C

OMPONENT

means materials which are manufactured with standardised

dimensions, and can be arranged or fitted together in various design

scenarios.

O

WNER

S

P

ROJECT

R

EQUIREMENTS

means the document outlining the goals, expectations for a project. It

may include performance criteria for the design team, contractors, or

maintenance personnel, and often includes specific requirements

regarding the aspiration for BEAM certification (also abbreviated

OPR).

O

ZONE

D

EPLETING

P

OTENTIAL

means the comparative rating given to chemical compounds related

to ozone layer degradation it may cause where released into the

atmosphere.