
Download Area
BEAM Plus Manual:
BEAM Assessment Tools:
Technical Circular Letter :
- - 2020.169 EU 3 Embodied Energy in Building Structural Elements & IA 2 Embodied Carbon During Construction Stage
- - 2020.168 Updated Exclusion Clauses for IEQ Credits
- - 2020.167 IEQ 1 Security
- - 2020.166 Enhancement of Submission Template
- - 2019.165 MA P4 Waste Recycling Facilities
- - 2019.164 EU 10 Testing and Commissioning
- - 2019.163 Major Amendments and Submission Template to MAN 1 to MAN 16 under BEAM Plus EB Version 2.0 Selective Scheme
- - 2019.162 IEQ P1 – Minimum Ventilation Performance
- - 2019.161 IEQ P1, 6 & 7 – Application of New IAQ Objectives for Minimum Ventilation Performance and Outdoor / Indoor Sources of Air Pollutants
- - 2019.160 EU 1 Energy Performance – Performance-Based Approach
- - 2019.159 (Revision 1 - with Track Changes) Comprehensive Review on Performance-Based Energy Benchmarking (2019)
- - 2019.159 (Revision 1) Comprehensive Review on Performance-Based Energy Benchmarking (2019)
- - 2019.158 (Revision 1 - with Track Changes) IA 2 Performance Enhancement – Electric Vehicle Charging Facilities
- - 2019.158 (Revision 1) IA 2 Performance Enhancement – Electric Vehicle Charging Facilities
- - 2019.157 EA 3 Energy Efficient Infrastructure
- - 2019.156 MAN 2b ESG Reporting under BEAM Plus EB Version 2.0 Comprehensive Scheme, MAN 3b ESG Reporting under BEAM Plus EB Version 2.0 Selective Scheme, CA 8 Corporate Social Responsibility Reporting under BEAM Plus ND Version 1.0
- - 2019.155 EU 11c Operator Training and Operation and Maintenance Facilities Appendix 8.5.8 Operator Training and Facilities
- - 2019.154 (Revision 1 - with Track Changes) EU 10 Testing and Commissioning
- - 2019.154 (Revision 1) EU 10 Testing and Commissioning
- - 2019.153 EU 1, 2 and 6 - Appendix 8.1.2 Performance-based Approach – Baseline Air-Conditioning System
- - 2018.152 WU 6 (EB Comprehensive Scheme) and WU 7 (EB Selective Scheme)
- - 2018.151 WU P3 (EB Comprehensive Scheme) and WU 6 (EB Selective Scheme)
- - 2018.150 SA 2a Car Parking Provisions
- - 2018.149 EU 9 (NB) / EU 7 (EB) Energy Efficient Appliances
- - 2018.148 EU 1 Reduction of CO2 Emissions and EU 2 Peak Electricity Demand Reduction
- - 2018.147 (Revision 2 - with Track Changes) EU P1, EU 1 and EU2 (All NB, EB, BI Versions) - Compliance of Building Energy Code & Energy Audit Code and Baseline Criteria for Energy Simulation
- - 2018.147 (Revision 2) EU P1, EU 1 and EU2 (All NB, EB, BI Versions) - Compliance of Building Energy Code & Energy Audit Code and Baseline Criteria for Energy Simulation
- - 2018.146 SA 10 Environmental Management Plan
- - 2018.145 SA 7a Landscaping and Planters - Hard Landscaping
- - 2018.144 EU 5 (NB) / EU 4 (EB) Lighting System in Car Parks
- - 2018.143 EU 4 (NB) Ventilation Systems in Car Parks / EU 3 (EB) Ventilated Systems in Car Park
- - 2018.142 MA 10 Demolition Waste Reduction and MA 11 Construction Waste Reduction
- - 2017.141 Comprehensive Scheme: EU 4 Energy Benchmarking and Improvement / Selective Scheme: EU 4 Energy Benchmarking
- - 2017.140 EU 1(b) Appendix 8.8.1.3 Building Envelope: Performance Approach and EU 13 Energy Efficient Building Layout
- - 2017.139 EU 5 Enhancement
- - 2017.138 SA 8b Elevated Temperatures
- - 2017.137 IEQ 8 IAQ in Car Parks
- - 2017.136 WU 2 Monitoring and Control
- - 2016.135 EU 1 Reduction of CO2 Emission and EU 2 Peak Electricity Demand Reduction
- - 2016.134 (Obsoleted) IEQ 13 Thermal Comfort in Air-conditioned premises (NB) / IEQ 14 Thermal Comfort in Air-conditioned premises (EB)
- - 2016.133 EU 1 Reduction of CO2 Emission and EU 2 Peak Electricity Demand Reduction (Superseded by Technical Circular Letter 2018.147 dated 14 May 2018)
- - 2016.132 EU P1 (NB/EB) / EU 1 (BI) Minimum Energy Performance (Superseded by Technical Circular Letter 2018.147 dated 14 May 2018)
- - 2016.131 (Obsoleted) Withdrawal of Technical Circular 2012.111
- - 2016.130 Water Use(WU)
- - 2016.129 SA 2a Car Parking Provisions
- - 2015.128 SA 8c Air Ventilation Assessment
- - 2015.127 SA 8a Wind Amplification
- - 2015.126 (Obsoleted) EU 11c) Operator Training and Operation and Maintenance Facilities Appendix 8.5.8 Operator Training and Facilities
- - 2015.125 IEQ 8 (NB) / IEQ 9 (EB) IAQ in Car Parks
- - 2014.124 (Obsoleted) MA P4 Waste Recycling Facilities
- - 2014.123 Sunset Clause for BEAM Plus Assessment Occupation Permit
- - 2014.122 (Obsoleted) EU 1, 2 and 6 - Appendix 8.1.2 Performance-based Approach - Baseline Air-Conditioning System (Superseded by Technical Circular Letter 2019.153 dated 21 January 2019)
- - 2014.121 EU 1c Appendix 8.8.1.4 Natural Ventilation: Performance Approach
- - 2014.120 SA P1 Minimum Landscape Area & SA 7b Soft Landscaping
- - 2014.119 Credits Not Applicable to Not Normally Occupied Buildings
- - 2014.118 (Obsoleted) IA 2 Performance Enhancement
- - 2014.117 MA 1 Building Reuse
- - 2013.116 for EU 5 Renewable Energy Systems
- - 2013.115 for Appendix 8.3 Equivalent Carbon Dioxide Emissions
- - 2013.114 BEAM Plus New Buildings: EU 9 Energy Efficient Appliances / BEAM Plus Existing Buildings: EU 7 Energy Efficient Appliances
- - 2013.113 MA 9 Regionally Manufactured Materials
- - 2013.112 EU 8 Clothes Drying Facilities
- - 2012.111 Sunset Clause for BEAM Plus Assessment (Superseded by Technical Circular Letter 2016.131 dated 18 February 2016)
- - 2012.110 BEAM Plus Assessment for Conversion of Industrial Building and Heritage Building Revitalisation Projects
- - 2012.109 (Obsoleted) MA P4 Waste Recycling Facilities
- - 2012.108r1.1 BEAM Provisional Assessment Criteria Compliance
- - 2012.107 BEAM Plus New Buildings v 1.1 page8-22, Appendix 8.6 Assumptions and Baselines for Water Consumption
- - 2011.106 Appendix 8.6 Assumptions and Baselines for Water Consumption
- - 2011.105 MA P1 Timer used for Temporary Works and MA 6 Sustainable Forest Products
- - 2011.104 WU2 Monitoring and Control
- - 2011.103 Ecological Impact SA5
- - 2011.102 Engaging Society
- - 2011.101 Assessor Site Verification
Meeting Schedule: